It is not convenient to provide more details for Nogo to design a 3D rendering based on the stage art model (refine the production drawing based on the use of safety load).
During the on-site live shooting installation process, Norinco arranged technicians to the site to guide the installation. The construction was completed the next day with the cooperation of Party A. All the workers worked overtime to get off work at 1:00 in the morning.
Add a process to the exterior and spray paint throughout the entire process, making the overall effect more aesthetically pleasing.
Opening (live filming)