Nuo Gou undertakes the lifting of the hall ceiling with aluminum alloy lighting frame, curved steel structure frame, LED screen frame, and private room LED screen frame, which took 60 days to complete and connect with various suppliers, lighting, LED screens, light strips, decoration, and design.
As the only entertainment bar in Guangzhou, the traffic is skyrocketing every day, and the entertainment activities are constantly updated every day, with various tricks. Next, let the editor reveal the on-site revelations for you.
1: Nuogo refined the design based on stage art: 30 sets of ceiling lighting frames for the lobby were produced
2: On site installation (installation of hall lighting rack)
3: Arc-shaped screen and steel structure lighting frame in the hall, welded and manufactured with ice screen frame (with a hammer lifting height of 6 meters and a load capacity of up to 600KG)
4: Welding of LED screens and light racks in private rooms (5 rooms with a height of 10M)
5: Opening and debugging stage